trd.fun / lab
Documentation theme

Archive

Updated 2026-09-06
Historical or superseded material retained for provenance, never presented as the plan.

Archive rule: every record below is historical or superseded. It is retained for provenance and is not the active plan.

  1. Wave-9 daily batch split — 6 September 2026Historical compute split: The active-49 planning record preceded the final 47-primary plus 2-coverage publication and remains provenance only.SUPERSEDED
  2. Wave-9 programme status — 5 September 2026Superseded programme snapshot: This preserved in-progress trial-61 record is replaced by the completed trial-63 status dated 8 September.SUPERSEDED
  3. Free-look battery decision recordSuperseded discovery record: The complete 28 August campaign record replaces this first fifteen-look snapshot.SUPERSEDED
  4. Touch-and-Turn tier-D RDDT follow-upClosed evidence: The ad hoc RDDT completeness follow-up does not reopen the refuted family.FROZEN
  5. Touch-and-Turn video ruleClosed evidence: The pre-registered Touch-and-Turn video rule was refuted.FROZEN
  6. North-star auditHistorical audit: This dated snapshot is preserved with its later verified preface.FROZEN
  7. A dash means no dataHistorical glossary: The dash convention survives, but its provenance claim was too broad.FROZEN
  8. Automation is conditionalHistorical architecture: Conditional automation remains true inside a narrower frozen plane.FROZEN
  9. Fail-closed rolloutHistorical rollout: Exact-40 deployment gates remain scoped to the frozen plane.FROZEN
  10. Forty outcomes, five jobsHistorical architecture: Forty outcomes and five jobs describe the frozen tournament only.FROZEN
  11. Forward means observationHistorical boundary: Forward meant paper observation within the Exact-40 runtime.FROZEN
  12. How ideas earn their wayHistorical lifecycle: The old strategy funnel predates the free-look battery.FROZEN
  13. Important current limitHistorical limit: Exact-40 controls remain valid only inside the frozen plane.FROZEN
  14. Legacy SPY-only systemHistorical system: The SPY-only v2 path is preserved evidence, not the desired product.FROZEN
  15. Only five research actionsHistorical method: The former five-action allowlist was narrower than today’s research estate.FROZEN
  16. Reading the numbersHistorical glossary: Pooled return is not a universal ranking statistic.FROZEN
  17. The five stagesHistorical sequence: The former five-stage path omitted the later live-lane gates.FROZEN
  18. The lifecycle wordsHistorical glossary: The former lifecycle ended before today’s live-path gates.FROZEN
  19. The outcomeHistorical scope: The former outcome stopped at forward paper observation.FROZEN
  20. The scoreboardHistorical scoreboard: The early strategy tally no longer covers the full decision record.FROZEN
  21. The things being testedHistorical glossary: Bot-by-stock is no longer the universal unit of research.FROZEN
  22. What is nextHistorical roadmap: The tournament-centric next step is no longer the plan.FROZEN
  23. Phase 1 — measurementSuperseded phase: Measurement repair is no longer the programme’s critical path.SUPERSEDED
  24. Phase 2 — search spaceSuperseded phase: The free-look battery replaced the tournament-centric search plan.SUPERSEDED
  25. Phase 3 — endgameSuperseded phase: The isolated live lane replaced the former paper-only endgame.SUPERSEDED
  26. Phase 4 — dashboardSuperseded phase: A dashboard is no longer ahead of edge discovery on the critical path.SUPERSEDED
  27. Refused as feature bloatSuperseded refusal: Broker-path work is now conditional critical-path work, not blanket feature bloat.SUPERSEDED
  28. The verdict so farSuperseded plan: The 21 August refit is retained as decision history.SUPERSEDED
LAB documentation describes design intent and research safeguards. It does not provide trading instructions or operational access.