trd.fun / lab
Reading room

LAB documentation

Updated 2026-09-08
Current contracts first. Historical plans stay visible, clearly labelled, and out of the active path.

What changed

The five newest records, with status and source attached.

  1. Strategy tests and results — 8 September 2026Complete source census: Search all 188 ideas by identity, actual disposition, furthest stage, recorded reason, next action, and available frozen metrics.CURRENT
  2. Wave-9 programme status — 8 September 2026Current programme snapshot: Trial 63 completed 49 evaluations, stopped the 47-row selection globally at S2, and selected no paper candidates.CURRENT
  3. Wave-9 daily batch split — 6 September 2026Historical compute split: The active-49 planning record preceded the final 47-primary plus 2-coverage publication and remains provenance only.SUPERSEDED
  4. Wave-9 amendment — same-bar trailing-stop conventionOwner-ratified at trial 61: The causal `prior_stop` convention defers a same-session ratchet and records every resolution on the period receipt.CURRENT
  5. Wave-9 paper candidate selection rulePre-registered before batch numbers: The deterministic survivor rule gates integrity, PBO, Holm, clustered DSR, cost stress, recency, family diversity, and the disclosed cap.CURRENT

The active objective, architectural decisions, and admitted contracts.

  1. Wave-9 programme status — 8 September 2026Current programme snapshot: Trial 63 completed 49 evaluations, stopped the 47-row selection globally at S2, and selected no paper candidates.CURRENT
  2. Feature backlog — agreed but not doneLiving register: The deduplicated backlog binds priority, provenance, blockers, owners, and next actions without hiding today’s completed work.LIVING
  3. The Lab, End to EndStart here: The complete lab story connects honest discovery, two preregistered candidates, and the fail-closed path to tiny live capital.LIVE
  4. Edge-discovery north starActive objective: Find edge as quickly as honest evidence permits without weakening the gates.LIVE
  5. Simplification review decision recordArchitecture decision: Freeze the existing planes and build one isolated daily-live lane.CURRENT
  6. First-hour admitted-series contractCurrent boundary: Database-owner admission replaces a permanent literal-hash pin.CURRENT
  7. First-hour series contract v3Current contract: Version three binds alpha tiers, evidence floors, sizing separation, and duplicate relation.CURRENT

Pre-registered ideas and discovery results that have not earned live authority.

  1. Strategy tests and results — 8 September 2026Complete source census: Search all 188 ideas by identity, actual disposition, furthest stage, recorded reason, next action, and available frozen metrics.CURRENT
  2. Wave-9 paper candidate selection rulePre-registered before batch numbers: The deterministic survivor rule gates integrity, PBO, Holm, clustered DSR, cost stress, recency, family diversity, and the disclosed cap.CURRENT
  3. Pre-registration amendment v1.3 — fractional executionOwner-ratified; not yet sealed: Fractional execution remains non-authoritative until the LL-5 chain, paper-NAV event, and merge-time rule/pin hashes close the seal blockers.CURRENT
  4. Momentum 12−1 amendment v1.2 — canary and prefix-NDraft; pending owner ratification: The one-share canary, rank-bound prefix-N construction, trial 53, and event schemas grant no authority until every owner and seal blocker closes.PENDING OWNER
  5. Where the next edge isRanked decision: Three Tier-B hypotheses remain after trial lessons, refuter amendments, power gates, and portfolio constraints are applied.DECISION
  6. Discovery Campaign: 50 Trials, Two SurvivorsCampaign result: The numbered campaign produced two preregistered equity candidates while preserving every refutation, caveat, and trial-ledger discrepancy.CURRENT
  7. Gross profitability long-only v1 preregistrationRegistered; lockbox unopened: GP/A alone is frozen for one lockbox opening and grants neither a lockbox result nor broker authority.CURRENT
  8. Momentum 12−1 long-only v1 preregistrationRegistered; lockbox unopened: Registration grants neither a lockbox result nor broker authority; v1.1 incubation amendment sealed.CURRENT

Live lane

5 records

The isolated path toward daily execution, with its current limits stated plainly.

  1. Funding-gate runbook — confirmed paper win to funded moneyPending runbook: The path from a pre-registered confirmed paper win to funded money names existing artifacts only and grants no authority.RUNBOOK/PENDING OWNER
  2. Live risk policy v2 — whole-share implementability draftDraft; pending owner ratification: The recommended per-name 90/90 rule remains loader-refused and cannot replace sealed policy v1 without A/B/C, Q17, final pins, and v4 engineering.PENDING OWNER
  3. LL-4: multi-strategy shadow-equity ledgers and capital priorityPending design: Per-strategy shadow equity, capital priority, netting, migration, and refusal semantics require new owner authority and fix-first engineering.DESIGN/PENDING OWNER
  4. Live risk policy v1 — momentum 12−1Owner-approved policy (Q11=A): The 252-session expiry and bounded five-minute reconciliation contract are current under the 27 August decision record.CURRENT
  5. Thin daily-live lane LL-3LL-2 paper-executable lane: The end-to-end paper path is available; live execution remains refused.CURRENT

The field guide, evidence rules, reviews, and definitions that keep research honest.

  1. Wave-9 amendment — same-bar trailing-stop conventionOwner-ratified at trial 61: The causal `prior_stop` convention defers a same-session ratchet and records every resolution on the period receipt.CURRENT
  2. Wave-9 amendment — zero-proceeds terminal eventsDraft; pending owner ratification: The typed zero-proceeds write-off replaces the 2026-09-02 interim fail-closed rule and authorises no broad Wave-9 row until the owner ratifies it.PENDING OWNER
  3. Diagnostics round-up — survivors, execution timing, and GP/AReport-only; trial:null: Survivor, OPG-versus-MOC, and GP/A decomposition diagnostics preserve their independent-review limits and grant no return, allocation, or execution claim.CURRENT
  4. Backtesting: The Complete Field GuideUse this first: The canonical field guide defines how honest historical simulation should work.CURRENT
  5. Six-lens field-guide gap reviewReview outcome: Six independent lenses turn the field guide into a ranked repair list.CURRENT
  6. Honest evaluationCore rule: Every attempt and every failure remains part of the evidence.CURRENT
  7. How evidence is kept honestShared vocabulary: Sealing, pre-registration, and independent checks prevent moving goalposts.CURRENT
  8. Independent reviewCore rule: Reproduction and review stay separate from owner authority.CURRENT
  9. Results are evidence-gatedPublication rule: A score is publishable only when its evidence can be reproduced.CURRENT

Capability language, custody, change records, and operational boundaries.

  1. Daemon supervision and alerting plan for rehearsals and livePending runbook: Same-host supervision, restart control, paging, dead-man coverage, and operator dates remain fix-first before installation.RUNBOOK/PENDING OWNER
  2. Sealed-artifact custodyCurrent custody: Sealed artifacts have an off-machine identity and storage path.CURRENT
  3. Capability is not activityOperational rule: Deployed code is not proof that anything is running.CURRENT
  4. What not to inferReading boundary: Documentation is neither live telemetry nor an investment claim.CURRENT
  5. 22 Aug 2026 — results drop and visible failureChange record: Results became auditable and a broken overnight run became visible.FROZEN
  6. 21 Aug 2026 — tournament armedChange record: The tournament and its audit surfaces were armed on 21 August.FROZEN
  7. 19–20 Aug 2026 — evidence machineChange record: The evidence chain became durable across 19 and 20 August.FROZEN

Archive

28 records

Historical or superseded material retained for provenance, never presented as the plan.

  1. Wave-9 daily batch split — 6 September 2026Historical compute split: The active-49 planning record preceded the final 47-primary plus 2-coverage publication and remains provenance only.SUPERSEDED
  2. Wave-9 programme status — 5 September 2026Superseded programme snapshot: This preserved in-progress trial-61 record is replaced by the completed trial-63 status dated 8 September.SUPERSEDED
  3. Free-look battery decision recordSuperseded discovery record: The complete 28 August campaign record replaces this first fifteen-look snapshot.SUPERSEDED
  4. Touch-and-Turn tier-D RDDT follow-upClosed evidence: The ad hoc RDDT completeness follow-up does not reopen the refuted family.FROZEN
  5. Touch-and-Turn video ruleClosed evidence: The pre-registered Touch-and-Turn video rule was refuted.FROZEN
  6. North-star auditHistorical audit: This dated snapshot is preserved with its later verified preface.FROZEN
  7. A dash means no dataHistorical glossary: The dash convention survives, but its provenance claim was too broad.FROZEN
  8. Automation is conditionalHistorical architecture: Conditional automation remains true inside a narrower frozen plane.FROZEN
  9. Fail-closed rolloutHistorical rollout: Exact-40 deployment gates remain scoped to the frozen plane.FROZEN
  10. Forty outcomes, five jobsHistorical architecture: Forty outcomes and five jobs describe the frozen tournament only.FROZEN
  11. Forward means observationHistorical boundary: Forward meant paper observation within the Exact-40 runtime.FROZEN
  12. How ideas earn their wayHistorical lifecycle: The old strategy funnel predates the free-look battery.FROZEN
  13. Important current limitHistorical limit: Exact-40 controls remain valid only inside the frozen plane.FROZEN
  14. Legacy SPY-only systemHistorical system: The SPY-only v2 path is preserved evidence, not the desired product.FROZEN
  15. Only five research actionsHistorical method: The former five-action allowlist was narrower than today’s research estate.FROZEN
  16. Reading the numbersHistorical glossary: Pooled return is not a universal ranking statistic.FROZEN
  17. The five stagesHistorical sequence: The former five-stage path omitted the later live-lane gates.FROZEN
  18. The lifecycle wordsHistorical glossary: The former lifecycle ended before today’s live-path gates.FROZEN
  19. The outcomeHistorical scope: The former outcome stopped at forward paper observation.FROZEN
  20. The scoreboardHistorical scoreboard: The early strategy tally no longer covers the full decision record.FROZEN
  21. The things being testedHistorical glossary: Bot-by-stock is no longer the universal unit of research.FROZEN
  22. What is nextHistorical roadmap: The tournament-centric next step is no longer the plan.FROZEN
  23. Phase 1 — measurementSuperseded phase: Measurement repair is no longer the programme’s critical path.SUPERSEDED
  24. Phase 2 — search spaceSuperseded phase: The free-look battery replaced the tournament-centric search plan.SUPERSEDED
  25. Phase 3 — endgameSuperseded phase: The isolated live lane replaced the former paper-only endgame.SUPERSEDED
  26. Phase 4 — dashboardSuperseded phase: A dashboard is no longer ahead of edge discovery on the critical path.SUPERSEDED
  27. Refused as feature bloatSuperseded refusal: Broker-path work is now conditional critical-path work, not blanket feature bloat.SUPERSEDED
  28. The verdict so farSuperseded plan: The 21 August refit is retained as decision history.SUPERSEDED
LAB documentation describes design intent and research safeguards. It does not provide trading instructions or operational access.